Transport fastening to remove
The chokes fitted in the UPS cabinet are supported both at the chassis.
These supports must be removed before placing the cabinet in the final location.
These supports are yellow and are indicated with an appropriate symbol on the assembly layout
drawing (see Fig. 3.6-1).
For parallel systems, the delivery also includes the bus control cables for inter-
connecting the UPS modules.
Packing material recycling
GE, in compliance with environment protection, use only environmentally friendly
material.
UPS packing materials must be recycled in compliance with all applicable
regulations.
Modifications reserved
OPM_SGS_ISG_M40_M50_2US_V021.doc
Fig. 3.6-3 Transport fastening to remove
Rear side
User Manual SG Series 400 & 500 UL S2
Page 17/41