GE SG 400 Series Installation Manual page 13

400 & 500 kva / 480vac ul / s2
Table of Contents

Advertisement

Openings for input and output cable connections
Fig. 3.4.1-2 Opening on top of the cabinet for input and output cables
Fig. 3.4.1-3 Opening on the bottom of the cabinet for input and output cables
Fixing of the UPS cabinet on the floor
The UPS cabinet is free standing and normally does not require to be bolted to the floor.
The UPS cabinet can be fixed however to the floor by bolting it with the supporting blocks to the
floor. See Fig. 3.4.1-4.
1.378"
35mm
22.028"
559.5mm
Ø 0.47305"
Ø 12mm
SGSU_400-500_S2_UPS view bottom_02US
Modifications reserved
OPM_SGS_ISG_M40_M50_2US_V021.doc
Utility input
Output Load
Battery
62.205"
1580mm
22.658"
575.5mm
Front side
Fig. 3.4.1-4 Fixing of the UPS cabinet on the floor
Utility input
SG Series 400 & 500
Output Load
Battery
openings are provided
on the top (*) and the
bottom (*) of the UPS
for the connection of
input
cables.
Pay attention to the
position
openings,
choosing
placement of the UPS.
These openings are
covered
protective plate.
*)
the plate before drilling
any holes.
33.268"
845mm
User Manual SG Series 400 & 500 UL S2
and
output
of
these
when
the
with
a
Please remove
1.378"
35mm
Page 13/41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg series 500

Table of Contents