Installation
The installation includes machine set-up, connection
to
water, electrical and drain,
calibration and customer
haining.
If
more than one
visit
is required
to
complete the
installation
due
to
an
unprepared site,
return visits
are
billable to the customer.
Placing the Unit
Verifu
counter
is stable
and
capable
of supporting
at least
300lbs.
The machine
height is 34.66
inches. Sufficient additional
space
is
needed
for pouring
beans and
for
bean
hopper
removal. Six
inches
minimum is recommended.
Gonnecting Drain
Only
a
qualified plumber complying
with all
local
codes and
requirements can
install
the
drain.
The
following
requirements must
be
met:
.
Connection
for a3/t" drainhose
.
Drain must
be
located
within
5
feet
of machine
.
An
indirect drain
is
required
to
ensure
waist water
does
not
travel up
hose
Minimum
rate
of fall required
is one
inch per
foot.
When installing the drain
hose
to
drain,
it
is
important that the drain
hose has
a
continuous rate
of fall.
If
the
drain
has
any
low
spots
or any horizontal runs
as
it travels from
the machine
to
the
drain, the water and other waste from the machine
will
back
up and
cause the
drain
hose
and/or
the drain tray to clog.
WRONG
INCORRECTLY
INSTALLED
DRAIN
RIGHT
CORRECTLY
INSTALLED DRAIN
lndirect
Drain
DRAIN
HOSE FROM MACHINE
Acorto 2000s/i
Technical Support
4-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000i

Table of Contents