Acorto 2000s User Manual page 133

Table of Contents

Advertisement

P
reventiative
Ma
i
nte
na
nce
Acorto recommen{s
Preventative Maintenance
every
10,000
drinks.
Preventative
Maintenance
is reqluired
to maintain
wamantv and extended service
agreements.
The Preventative
l\laintenance Kit, Acorto
Part
Number:
5000-010. includes:
'
All
Necessary
Parts
'
PreventativeMaintenance Directions
.
Prevcntative Maintenance
Checklist
-
Must be returned to Acorto
,.
,
.rt
,lr'
PM
Kit ttarts List
(partNumberso0o-010)5
)cfl'l'M't
\
1
PART INUMBER
DESCRIPTION
NOTES
Quantity
3400-01 7
1
120-'108
1245-001
2140-051
2140-010
2140-022
1260-052
5000-01'18
Water
test
stnps
Filter-Foam
Air
Filter
Air
Vent,
Milk
Valve
Gasket-lower Piston
(wh
ite)
O-ring-wiping (black)
O-ring Upper Piston (black)
O-ring
3132x151
16x1
1
18
PM Directions
and
Checklist
Lower piston
seal
Lower piston
seal,
upPer
seal
Also
used
on
lower piston
Drain block
(this document)
1
4
I
1
a
1
1
ADDITIONAL PARTS NEEDED,
US
MACHINES ONLY
Not
included
in
this
hit.
Must
be
ordered
separately
for
all
US
Machines
unless site has provided
a
water trrtatment system.
98326
98327
Cartridge
MC Filter
Cartridge
SO Filter
2000 Grain
Filter
1
2000
Grain
Softener
2
lnstructions
1'he purpose
for
completing
a
Preventative Maintenance
call is to
ensure
proper
operalio;
of
Acorlo
machines
through the proactive
replacement, cleaning
and
adjusttnent
of
internal components.
[Jse
thre
following
directions
to
complete the Preventative Maintenance
call. It
is
irnporl.ant
to
ensure
you
use
the Preventative
Maintenance
Call checklist to track
the
completion ol'each
step and
your findings.
When
you
have
:finished
the Preventative Maintcnancc. erplain the work you
have
completed
to
the
customer and communicate
any additional work you
determine
necess,ary.
E,nsurr:
the
PM
Clhecklist
is
complete
and ask
the
customer
to
sign
your
the
Checklist.
Retum
the PM Checklist to Acorlo with your
invoice. Acorto
requires
the Checklist
be
returned
for
payment
of
the
invoice.
1.
Tlre customer must sign
the
PM
Checklist
2.
R,eturn
the
PM
Ghecklist with your invoice
3.
The
PM
Checklist is required for payment of the Invoice
15-2
Acorto 2000s/i
Technical
SuPPort

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000i

Table of Contents