The Heat Pumps Optima 1000 And 1300; What The Shipment Includes - IVT Optima 1000 Assembly, Commissioning And Maintenance Manual

Table of Contents

Advertisement

5. Connect the pump to the heating system. Follow the instructions for
the operating mode in question.
6. Install the outdoor sensor and possible room sensor.
7. Fill and vent the heating system before commissioning.
8. Connect the heat pump to the electrical system. Use the wiring
diagram applicable to the operating mode in question.
9. Connect an external switch, the electric cabinet, an earth-fault breaker
and the additional heat supply.
10. Connect a general alarm, external controls and load monitor.
11. Commission the heat pump by making all the necessary settings on
the control panel.
12. Check the heat pump after commissioning.

The heat pumps Optima 1000 and 1300

What the shipment includes

The following components are included in the delivery of the Optima heat pumps 1000 and 1300:
Rubber feet
Quantity: 4
Art. no: 381 007
Outdoor sensor T2 (GT2) with cable
Quantity: 1
Art. no: 240 690
Return sensor
Quantity: 3
Cable: 4 m
Art. no: 240 693
Electric cabinet
Quantity: 1
Particle fi lter with screen
Quantity: 1
Art. no: 142 025
Circlip pliers
Quantity: 1
Art. no: 142 021
Manual
Quantity: 1
Art. no: 290 548-9
39
The heat pumps Optima 1000 and 1300

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima 1300

Table of Contents