Instructions For Changing Blade Speed; Pre-Operation Checklist, Schedule Maintenance Quick Reference - MK Diamond Products MK-4018KB Operator's Manual

Concrete saw mk-4000 series
Table of Contents

Advertisement

MK-4000 SERIES
PRE-OPERATION CHECKLIST
WARNING
Before leaving our factory, every machine is thoroughly tested. Follow instructions strictly and your machine
will give you long service in normal operating conditions.
Before starting up the machine, make sure you read this entire Operation Manual and are familiar
with the operation of the machine.
Machine Cold
1. Check engine oil. See Engine Owner's Manual for type and quantity.
2. Connect battery cables.
3. Check hydrostatic transmission fluid level.
4. Test hydraulic operations. Raise and lower.
5. Check the engine air cleaner.
SCHEDULE MAINTENANCE QUICK REFERENCE
1-2 Hour Operation Checklist
WARNING
ALWAYS locate machine on a level surface with the engine "OFF" and the ignition switch set in the "OFF"
position before performing any maintenance. Let the machine cool down prior to any service.
1. Check the engine air cleaner hose clamps. Tighten as required.
2. Tension the blade drive V-belts. DO NOT overtension.
WARNING
Before performing any maintenance, ALWAYS locate machine on a level surface with the engine "OFF" and
the ignition switch set in the "OFF" position.
Service Daily:
1. Check engine oil level.
2. Check blade guard for damage.
3. Check hoses and clamps for damage or looseness. Tighten or replace as necessary.
4. Check air cleaner for restriction. Replace air filters at regular intervals.
Interval Service:
See the Maintenance Schedule Table on Page 25.
INSPECTION & START-UP
17

Advertisement

Table of Contents
loading

Table of Contents