Service Record - Benchmark Alpha InTec 24X Installation And Servicing Instructions

Wall mounted, fan assisted, room sealed, gas fired, high efficieny condensing combination boilers
Table of Contents

Advertisement

SERVICE RECORD

It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed.
Service Provider
Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer's instructions.
Always use the manufacturer's specifed spare part when replacing controls.
SERVICE 01
Engineer name:
Company name:
Telephone No:
Gas safe register No:
At max. rate:
Record:
At min. rate:
(Where Possible)
Comments:
Signature
SERVICE 03
Engineer name:
Company name:
Telephone No:
Gas safe register No:
At max. rate:
Record:
At min. rate:
(Where Possible)
Comments:
Signature
SERVICE 05
Engineer name:
Company name:
Telephone No:
Gas safe register No:
At max. rate:
Record:
At min. rate:
(Where Possible)
Comments:
Signature
SERVICE 07
Engineer name:
Company name:
Telephone No:
Gas safe register No:
At max. rate:
Record:
At min. rate:
(Where Possible)
Comments:
Signature
SERVICE 09
Engineer name:
Company name:
Telephone No:
Gas safe register No:
At max. rate:
Record:
At min. rate:
(Where Possible)
Comments:
Signature
*
All installations in England and wales must be notified to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
© Heating and Hotwater Industry Council (HHIC)
Date:
CO
ppm AND
CO ² %
CO
ppm AND
CO ² %
Date:
CO
ppm AND
CO ² %
CO
ppm AND
CO ² %
Date:
CO
ppm AND
CO ² %
CO
ppm AND
CO ² %
Date:
CO
ppm AND
CO ² %
CO
ppm AND
CO ² %
Date:
CO
ppm AND
CO ² %
CO
ppm AND
CO ² %
SERVICE 02
Engineer name:
Company name:
Telephone No:
Gas safe register No:
At max. rate:
Record:
At min. rate:
(Where Possible)
Comments:
Signature
SERVICE 04
Engineer name:
Company name:
Telephone No:
Gas safe register No:
At max. rate:
Record:
At min. rate:
(Where Possible)
Comments:
Signature
SERVICE 06
Engineer name:
Company name:
Telephone No:
Gas safe register No:
At max. rate:
Record:
At min. rate:
(Where Possible)
Comments:
Signature
SERVICE 08
Engineer name:
Company name:
Telephone No:
Gas safe register No:
At max. rate:
Record:
At min. rate:
(Where Possible)
Comments:
Signature
SERVICE 10
Engineer name:
Company name:
Telephone No:
Gas safe register No:
At max. rate:
Record:
At min. rate:
(Where Possible)
Comments:
Signature
Date:
CO
ppm AND
CO ² %
CO
ppm AND
CO ² %
Date:
CO
ppm AND
CO ² %
CO
ppm AND
CO ² %
Date:
CO
ppm AND
CO ² %
CO
ppm AND
CO ² %
Date:
CO
ppm AND
CO ² %
CO
ppm AND
CO ² %
Date:
CO
ppm AND
CO ² %
CO
ppm AND
CO ² %
www.centralheating.co.uk

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Alpha InTec 24X and is the answer not in the manual?

Table of Contents