Earth Ground Rod Installation (Optional); Power Wiring - Chamberlain LA400 Installation And Operation Manual

Medium duty swing gate operator
Hide thumbs Also See for LA400:
Table of Contents

Advertisement

EARTH GROUND ROD
INSTALLATION (OPTIONAL)
NOTE: For proper operation, do not connect the
earth ground rod to the green screw on the outlet
plate.
1. Install earth ground rod within 3' (0.9 m) of the
operator.
2. Disconnect and remove the green/yellow ground wire connected to the screw terminal of the control board.
3. Attach earth ground rod wire to the screw terminal of the control board marked
connection remains securely connected to the green screw on the outlet plate.
To AVOID damaging gas, power or other underground utility
lines, contact underground utility locating companies BEFORE
digging.
P2
J19
Ø14GPØ89ØE
Ø14SKØ89ØE
Ø14LGØ89ØE
NO
L1
C
NC
1
S8
OFF
ON
SAVE
OFF
ON
MAGLOCK
LEARN
SINGLE
DUAL
MODE
ALARM
XMITTER
NO
NC
EDGE
NO
NC
PHOTO
2
S1
BRN
MAGLOCK
GRN
WHT
R223
YEL
J19
CLOSE
EDGE
BLU
R2Ø7
NO
Z2Ø
Z1
C
R227
Z1
RED
K5
OPEN EDGE/
PHOTO
GATE 1
GATE 1
L1
R224
24V
GRN
U4
Z22
R2
R92
LEARN
Z9
10A 32V
R1
XMITTER
OPEN
PHOTO
ACCESSORY
2
POWER
F3
R91
CONTROL
D1Ø
K2
INPUTS
24V
DIAGNOSTIC
OPEN
BLU
BRN
GATE 1
SINGLE BUTTON
GRN
SET
SET
RESET
Z12
K1
Q9
OPEN
CLOSE
LIMITS
LEARN
WHT
LIMIT
LIMIT
STOP
R9Ø
GATE 2
RUNNING
TIMER
ACCESSORY
YEL
COM
POWER
CONTROL
BLU
FORCE
TIMER TO
CLOSE
SINGLE
BUTTON
INPUTS
COM
R1Ø1
OPEN
RED
R1ØØ
POWER
F4
SINGLE BUTTON
GATE 2
ACCESSORY
RESET
10A 32V
OVLD
K4
STOP
OFF
MAX
COM
F5
COM
D21
R35
POWER
K3
D9
D8
C12
D27
Z3
F7
LOOP
Z4
C13
INPUTS
Q22
D22
C4
SHADOW
U3
C11
INTERRUPT
POWER
CHGR
COM
C2
D15
R196
OVLD
24 VAC/
F6
GATE 2
D27
Z3
SOLAR
F2
F1 20A 32V
INPUT
MOV2
MOV1
C64
R9
D1
D4
FUSE
BATT 2
BATT 1
JMPR2
JMPR1
OPEN
DB1
U2
D2
R4
J4
FUSE
OPEN
FUSE
OPEN
12 Gauge Wire
Earth Ground
Installation (Optional)
22
CAUTION
. Ensure the power wiring ground
R4
C2
J4
Ground Screw
Control Box
3' (0.9 m)
8' (2.4 m)
24 VAC/
SOLAR
INPUT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents