Motor Wiring; Step 1: Watertight Connector Nut; Step 2: Insert Operator Cable - Chamberlain LA400 Installation And Operation Manual

Medium duty swing gate operator
Hide thumbs Also See for LA400:
Table of Contents

Advertisement

MOTOR WIRING

To reduce the risk of SEVERE INJURY or DEATH:
• ANY maintenance to the operator or in the area near the
operator MUST not be performed until disconnecting the
electrical power and locking-out the power via the operator
power switch. Upon completion of maintenance the area MUST
be cleared and secured, at that time the unit may be returned
to service.
• Disconnect power at the fuse box BEFORE proceeding.
Operator MUST be properly grounded and connected in
accordance with local electrical codes. NOTE: The operator
should be on a separate fused line of adequate capacity.
• ALL electrical connections MUST be made by a qualified
individual.

Step 1: Watertight Connector Nut

Insert operator cable through watertight connector nut.

Step 2: Insert Operator Cable

Insert operator cable through watertight connector mounted in the bottom of the control box.
Operator
Cable
Watertight
Connector
Nut
J19
14GP 89
14LG 89
14SK 89
R223
L1
CLOSE
EDGE
K6
ALARM
S8
OFF
ON
SAVE
R2Ø7
NO
OFF
ON
MAGLOCK
Z2Ø
LEARN
SINGLE
DUAL
MODE
R227
C
XMITTER
NO
NC
EDGE
K5
NO
NC
PHOTO
MAGLOCK
OPEN EDGE/
S1
PHOTO
NO
L1
C
R224
Z22
U4
R92
NC
R2
ON
OFF
Z9
LEARN
MAGLOCK
Z1
R1
XMITTER
OPEN
PHOTO
10A 32V
GATE 1
F3
R91
BRN
R94
D1Ø
K2
GRN
Z8
WHT
CLOSE
DIAGNOSTIC
PHOTO
YEL
R93
BLU
GATE 1
RED
SET
SET
Z12
K1
Q9
LEARN
OPEN
CLOSE
LIMITS
LIMIT
LIMIT
ACCESSORY
R9Ø
GATE 2
TIMER
RUNNING
COM
POWER
OVLD
CONTROL
24V
TIMER TO
INPUTS
R1Ø1
FORCE
CLOSE
OPEN
BRN
R1ØØ
SINGLE BUTTON
F4
GRN
ACCESSORY
RESET
10A 32V
OVLD
WHT
STOP
K4
YEL
OFF
MAX
COM
F5
BLU
COM
D21
R35
POWER
RED
D9
K3
GATE 2
D8
C12
D27
Z3
F7
LOOP
Z4
INPUTS
Q22
D22
C13
C4
SHADOW
U3
INTERRUPT
C11
CHGR
COM
D15
R4
C2
R196
OVLD
F6
24 VAC/
F2
SOLAR
F1 20A 32V
INPUT
MOV2
J4
MOV1
R9
D4
C64
D1
FUSE
BATT 2
BATT 1
JMPR2
JMPR1
OPEN
U2
D2
DB1
Watertight
Connector
Watertight
Connector
Nut
WARNING
• DO NOT install ANY wiring or attempt to run the operator
without consulting the wiring diagram. We recommend that
you install an optional reversing edge BEFORE proceeding with
the control station installation.
• ALL power wiring should be on a dedicated circuit and well
protected. The location of the power disconnect should be
visible and clearly labeled.
• ALL power and control wiring MUST be run in separate
conduit.
• BEFORE installing power wiring or control stations be sure to
follow ALL specifications and warnings described below.
Failure to do so may result in SEVERE INJURY to persons
and/or damage to operator.
Operator
P2
Control Box
24V
Operator
Cable
Operator
Cable
19
Operator

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents