Step 11: Open The Control Box; Step 12: Select Mounting Holes; Step 13: Mount Control Box - Chamberlain LA400 Installation And Operation Manual

Medium duty swing gate operator
Hide thumbs Also See for LA400:
Table of Contents

Advertisement

NOTE: It is recommended that the control box be mounted within 3' (.9 m) of Gate 1 or Gate 2.

Step 11: Open the Control Box

Remove screws and open the control box.
Screws (4)

Step 12: Select Mounting Holes

Select holes to be used for mounting and knock out using a screwdriver and hammer.
ALARM
NO
C
MAGLOCK
NO
C
NC
Z1
GATE 1
BRN
GRN
WHT
YEL
BLU
RED
Z12
ACCESSORY
POWER
Knock Outs
24V
BRN
GRN
WHT
YEL
BLU
RED
GATE 2
R4
C2
24 VAC/
J4

Step 13: Mount Control Box

Secure control box to mounting surface (post, wall, column, etc.) using appropriate hardware.
Square Gate
Post
Screw
Knock Outs
P2
R223
CLOSE
J19
EDGE
K6
Ø14GPØ89ØE
Ø14LGØ89ØE
Ø14SKØ89ØE
R2Ø7
Z2Ø
R227
K5
OPEN EDGE/
PHOTO
L1
R224
U4
Z22
1
S8
R92
OFF
ON
SAVE
R2
OFF
ON
MAGLOCK
Z9
LEARN
SINGLE
DUAL
MODE
OPEN
R1
XMITTER
NO
NC
EDGE
PHOTO
10A 32V
NO
NC
PHOTO
2
S1
F3
R91
R94
D1Ø
K2
Z8
CLOSE
DIAGNOSTIC
PHOTO
R93
GATE 1
SET
SET
K1
LEARN
Q9
OPEN
CLOSE
24V
LIMITS
LIMIT
LIMIT
SWITCHED
TIMER
R9Ø
GATE 2
ACCESSORY
COM
OVLD
RUNNING
POWER
OVLD
CONTROL
BIPART
TIMER TO
SINGLE
INPUTS
DELAY
CLOSE
BUTTON
R1Ø1
FORCE
OPEN
R1ØØ
SINGLE BUTTON
F4
ACCESSORY
RESET
10A 32V
OVLD
STOP
K4
MIN
MAX
OFF
MAX
OFF
MAX
COM
F5
COM
D21
R35
POWER
K3
D9
D8
C12
D27
Z3
F7
LOOP
Z4
INPUTS
C13
D22
C4
Q22
SHADOW
U3
INTERRUPT
C11
CHGR
COM
D15
R196
OVLD
F6
F2
F1 20A 32V
SOLAR
INPUT
MOV2
MOV1
R9
D4
D1
FUSE
C64
BATT 2
BATT 1
JMPR2
JMPR1
OPEN
U2
D2
DB1
Knock Outs
18
Knock Outs
Round Gate
Post
Lock Washer
(Not Provided)
Hex Nut
(Not Provided)
Knock Outs
U Bolt
(Not Provided)
Washer
(Not Provided)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents