Gas Supply Natural Gas - andrews CSC 39 Installation Manual, Operation And Service Manual

Table of Contents

Advertisement

INSTALLATION
The installation of the gas supply must conform, depending on it's size, to the
requirements of British Standards and Codes of Practice listed in Section 1 of this manual.
A gas meter will be connected to the service pipe by British Gas plc or it's authorised
contractor.
The meter and service pipe should be checked by British Gas or it's authorised contractor
to ensure that they are adequate to deal with the gas supply to the water heater(s) in
addition to any existing or additional requirements.
CAUTION!
DO NOT APPLY HEAT IN CLOSE PROXIMITY TO THE GAS CONTROL THERMOSTAT
AS THIS WILL RESULT IN DAMAGE OCCURRING TO THE CONTROL.
Fit the gas cock immediately upstream of the gas control valve using a suitable jointing
compound and connect to the gas supply. An inlet nipple and m/f elbow is factory fitted
to the gas control valve to avoid possible damage.
Where the water heater(s) is(are) installed in a boiler house or purpose built
compartment, a manually operated valve for the boiler house must be fitted in
accordance with the Gas Safety (Installation and Use) Regulations 1998. The valve must
be easily identified and readily accessible.
After installation, the system should be pressure tested for soundness and purged in
accordance with BS 6891 or IM/2 and IM/5 as appropriate.
Gas Cock
Nipple
U.P .T. Thread
BSP Thread
GAS SUPPLY
NATURAL GAS
M/F Elbow
Gas Valve
Fig 1.
SECTION 3
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cscl 59Cscl 93Cscl 78Cscl 39Csc59Csc93

Table of Contents