Furnace Location Relative To Cooling Equipment - Carrier 58MSA Installation, Start-Up, And Operating Instructions Manual

4-way multipoise fixed-capacity condensing gas furnace for sizes 040—120 series 140
Table of Contents

Advertisement

LEVEL (0")
FRONT
TO
" MAX
1
2
UPFLOW OR DOWNFLOW
Fig. 13—Furnace Location for Proper Condensate
NOTE: For upflow/downflow applications install furnace so that
it is level or pitched forward within 1/2-in. for proper furnace
operation. For horizontal applications pitch 1/4-in. minimum to
1/2-in. maximum forward to ensure proper condensate drainage
from secondary heat exchangers. (See Fig. 13.)
When a furnace is installed so that supply ducts carry air circulated
by the furnace to areas outside the space containing the furnace,
the return air shall also be handled by duct(s) sealed to furnace
casing and terminating outside the space containing the furnace to
ensure there will not be a negative pressure condition within
equipment room or space.
Do not install furnace in a corrosive or contaminated atmo-
sphere. Make sure all combustion and circulating air require-
ments are met. Failure to follow this caution will result in
minor unit operation or performance satisfaction.
FRONT
"
1
MIN
4
TO
" MAX
1
2
HORIZONTAL
Drainage
This gas furnace may be used for construction heat provided
that:
-The furnace is permanently installed with all electrical
wiring, piping, venting and ducting installed according to
these installation instructions. A return air duct is provided,
sealed to the furnace casing, and terminated outside the space
containing the furnace. This prevents a negative pressure
condition as created by the circulating air blower, causing a
A02146
flame rollout and/or drawing combustion products into the
structure.
-The furnace is controlled by a thermostat. It may not be "hot
wired" to provide heat continuously to the structure without
thermostatic control.
-Clean outside air is provided for combustion. This is to
minimize the corrosive effects of adhesives, sealers and other
construction materials. It also prevents the entrainment of
drywall dust into combustion air, which can cause fouling and
plugging of furnace components.
-The temperature of the return air to the furnace is no less
than 55 degrees F, with no evening setback or shutdown. The
use of the furnace while the structure is under construction is
deemed to be intermittent operation per our installation
instructions.
-The air temperature rise is within the rated rise range on the
furnace rating plate, and the firing rate has been set to the
nameplate value.
-The filters used to clean the circulating air during the
construction process must be either changed or thoroughly
cleaned prior to occupancy.
-The furnace, ductwork and filters are cleaned as necessary to
remove drywall dust and construction debris from all HVAC
system components after construction is completed.
Step 2—Furnace Location Relative to Cooling
Equipment
The cooling coil must be installed parallel with or on downstream
side of furnace to avoid condensation in heat exchanger. When
installed parallel with a furnace, dampers or other means used to
control flow of air shall be adequate to must prevent chilled air
from entering furnace. If dampers are manually operated, they
must be equipped with a means to prevent operation of either unit
unless damper is in full-heat or full-cool position.
Do not install furnace on its back. Safety control operation
will be adversely affected. Never connect return-air ducts to
back of furnace. Failure to follow this warning could result in
fire, personal injury, or death. (See Fig. 14.)
13