Procedures For Transporting Machine - Alto ENCORE S2426 Operator's Manual

Hide thumbs Also See for ENCORE S2426:
Table of Contents

Advertisement

Procedures For Transporting
How to Put the Machine Into a Van or Truck
WARNING:
This machine is heavy. Get
assistance before attempting
to transport or move it. Use
two able persons to move the
machine on a ramp or
incline. Always move slowly.
Do not turn the machine on a
ramp. Do not stop and leave
the machine on a ramp or
incline. The loading ramp
must be a minimum of 32"
wide.
WARNING:
Machines can topple over if
guided over the edges of
stairs or loading docks and
cause injury or damage.
Stop and leave this machine
only on a level surface.
When you stop the machine,
put all switches into their
"OFF" position.
1. Make sure the loading ramp is at least eight
(8) feet (2.5m) long and a minimum of 32" (0.8m)
wide, and strong enough to support the machine.
2. Make sure the ramp is clean and dry.
3. Put the ramp in position.
4. Remove squeegee assembly, brush housing and
brush or pad driver before loading. ALTO recom-
mends that both the solution tank and recovery
tank are empty before loading.
5. Turn key switch "ON" (on L2426 model only).
6. Align the machine on a level surface five (5) feet
(2 m) in front of the ramp.
7. Put the traverse knob at full speed (on L2426
model only).
8. For the L2426 machine, push in either one of the
forward/reverse switches while pushing in the
white reverse switch. Back the machine up the
ramp. See figure 1.
9. For the S2426 machine, push the machine
backwards to the top of the ramp.
10. Turn the key switch "OFF".
Page
-6-
CLARKE TECHNOLOGY Operator's Manual -Encore S2426/L2426
Figure #1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Encore l2426

Table of Contents