Perlick DC90ACLT Installation And Operation Instructions Manual

Arcticold draft dispenser

Advertisement

Quick Links

INSTALLATION ANd OPERATION INSTRUCTIONS
ARCTICOLd dRAfT dISPENSER
IMPORTANT INfORMATION
To register your product, visit our web site at
(www.perlick.com). Click on "Commercial", then
"Service". You will see the link to "Warranty
Registration Form". You must complete and submit
this form or the installation date will revert back to
the ship Date. The unit comes with a one year
parts warranty.
This manual has been prepared to assist you in the
installation of your ArctiCold Draft Dispenser and to
acquaint you with its operation and maintenance.
We dedicate considerable time to ensure that our
products provide the highest level of customer
satisfaction. If service is required, your dealer can
provide you with a list of qualified service agents.
For your own protection, never return merchandise
for credit without our approval.
We thank you for selecting a Perlick product and
assure you of our continuing interest in your
satisfaction.
WARNING: When lifting, the full weight of the
cabinet must be supported. Lift from the cabinet
base and not from the top. Improper lifting can
result in severe damage to the cabinet.
8300 West Good Hope Road • Milwaukee, WI 53223 • Phone 414-353-7060 • Fax 414-353-7069
Toll Free 800-558-5592 • E-Mail: Perlick@Perlick.com • www.Perlick.com
MODEL NOS.
DC90ACLT

Table of Contents

Preparing the Cabinet for Use
Specifications ........................................................2
Initial Setup............................................................3
Electrical ................................................................3
Tapping
Connecting the Keg Coupler.................................4
Connecting the Regulator .....................................5
Adjusting Gas Flow ...............................................5
Leak Test .......................................................5
2
Gas Cylinder..............................5
2
Gas .................................................5
2
Cleaning
Cleaning the Beer Lines ........................................6
Cleaning the Cabinet .............................................6
Wiring Diagrams ....................................................8
Glycol Loop Diagrams ...........................................9
Preventative Maintenance ...................................10
Form No. Z2323
Rev. 06.26.10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DC90ACLT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Perlick DC90ACLT

  • Page 1: Table Of Contents

    How to Pour a Perfect Glass of Beer ....7 for credit without our approval. Wiring Diagrams ............8 We thank you for selecting a Perlick product and Glycol Loop Diagrams ...........9 assure you of our continuing interest in your Preventative Maintenance ........10 satisfaction.
  • Page 2: Specifications

    [ 698 ] 43 1/16” [ 904 ] DOOR [ 1094 ] OPENING 7 1/2” [ 191 ] Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2323 Rev. 06.26.10...
  • Page 3: Initial Setup

    WARNING: Always disconnect power cord before servicing. Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2323 Rev. 06.26.10...
  • Page 4: Connecting The Keg Coupler

    Close faucet and wait for at least 15 minutes to ■ allow beer system to “pack”. You are now ready to tap beer. ■ Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2323 Rev. 06.26.10...
  • Page 5: Connecting The Regulator

    If bubbles appear, tighten connection. Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2323 Rev. 06.26.10...
  • Page 6: Cleaning The Beer Lines

    All domestic draft beers contain a small amount of yeast which remains in the beer from the Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2323 Rev. 06.26.10...
  • Page 7: General Information How To Pour A Perfect Glass Of Beer

    CO producing a ⁄ to 1” 4” foam head. ➠ STEP 4 Close the faucet quickly and completely. Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2323 Rev. 06.26.10...
  • Page 8: Wiring Diagrams

    Wiring Diagrams ArctiCold Draft Dispenser Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2323 Rev. 06.26.10...
  • Page 9: Glycol Loop Diagrams

    ArctiCold Draft Dispenser PUMP TUBE TUBE TUBE TUBE GLYCOL TANK HEAT EVAPORATOR EXCHANGER FIN COIL FLASH CHILL/FIN COIL CIRCUIT Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2323 Rev. 06.26.10...
  • Page 10: Preventative Maintenance

    2" below the threads. Contact the Perlick Corporation for proper glycol solution if needed. Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2323 Rev. 06.26.10...
  • Page 11 Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2323 Rev. 06.26.10...
  • Page 12 8300 West Good Hope Road • Milwaukee, WI 53223 • Phone 414-353-7060 • Fax 414-353-7069 Toll Free 800-558-5592 • E-Mail: Perlick@Perlick.com • www.Perlick.com Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2323...

Table of Contents