U-Line CLR1215 User Manual page 16

15" clear ice maker
Hide thumbs Also See for CLR1215:
Table of Contents

Advertisement

USER GUIDE
SAFETY • INSTALLATION & INTEGRATION • OPERATING INSTRUCTIONS • MAINTENANCE • SERVICE
8
Wiring Plug
Ground Terminal
Pump Assembly
INSTALLATION PROCEDURE
!
WARNING
To prevent accidental electrocution, make
certain that the floor surfaces surrounding the
unit are dry whenever power/electricity is
removed from, or applied to the unit.
1. Disconnect your unit from its electrical outlet/socket.
2. Use a screwdriver, push the power/electric cord
grommet through its seat in the back panel.
3. Using a screwdriver or 1/4" nut driver, remove the 12
screws from the back panel.
4. Remove the drain line/pipe from the storage bin drain
nipple. Save the clamp for pump installation.
!
CAUTION
To prevent damage to the pump, leave sufficient
space between leveling leg and pump.
5. Fully extend the left rear leveling foot.
Discharge Tube Connector
Drain Tube Connector
Vent Tube Connector
Note: Slide clamp on hose end
before installing hose. Do not
tighten clamp until pump and
hoses have been installed.
6. Install the 3 hoses and hose
clamps to the pump assembly
as shown below. Do not tighten
clamps at this time.
Discharge Tube
7. Remove the protective paper from the adhesive strip
and carefully set pump inside of unit.
8. Unplug jumper block from ice
machine wiring harness
(jumper block has a single
pink wire). Discard jumper
block.
9. Connect pump wiring plug
to the ice machine wiring
harness connector, where
the jumper block was
removed. The connector is
keyed and can only be
inserted one way.
!
CAUTION
When working with tools inside of unit, be
careful so as not to nick or damage any
refrigerant lines/pipes or wires.
u-line.com
Drain Tube
Vent Tube
Jumper
Block
Pump Wiring
Plug
Drain Pump 2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000 seriesClr1215 1000 series

Table of Contents