Napoleon 9500 series Installation And Operating Instructions Manual page 31

Single stage multi position high efficiency condensing forced air gas furnace
Table of Contents

Advertisement

FIGURE 18 - HORIZONTAL RIGHT VENT AND DRAINING OPTION
RIGHT VENT INSTALLATION
IMPORTANT:
• PRIME CONDENSATE TRAP WITH WATER AND CUT DRAIN HOSES TO PROPER LENGTH.
• CUT PRESSURE SWITCH TUBING TO PROPER LENGTH.
FIGURE 19 - DOWNFLOW VENT AND DRAINING OPTION
LEFT VENT INSTALLATION
IMPORTANT:
• PRIME CONDENSATE TRAP WITH WATER AND CUT DRAIN HOSES TO PROPER LENGTH.
• CUT PRESSURE SWITCH TUBING TO PROPER LENGTH.
TOP VENT INSTALLATION
RIGHT VENT INSTALLATION
31
IOM
W415-0973 / B / 08.28.13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9600 series

Table of Contents