Stacking Height Sign New - Schwank SET - SETU Installation And Owner's Manual

Two stage low intensity tube type infrared heaters
Hide thumbs Also See for SET - SETU:
Table of Contents

Advertisement

tolerance which may degrade at lower temperatures are protected to prevent degrada-
tion.
VENT END CLEARANCE: Clearances from the vent pipe are determined by local or national
installation codes, but must not be less than 6 inches (15 cm). For 'unvented' installation, a
minimum distance of 24 inches (61 cm) is required from the end of heater to a combustible
surface.
In locations used for the storage of combustible materials: Signs
WARNING
must be posted specifying the maximum permissible stacking height to
maintain the required clearances from the heater to the combustibles.
The signs must be posted either adjacent to the IR heating system thermostats or in the ab-
sence of such thermostats, in a conspicuous place.
For your convenience a "peel and stick" sign
is provided with this heater. Use a permanent
marker to record the required dimensions on
the sign.
To calculate the value 'H': (H = T - C)
 Measure the on site distance between bottom of
the heater and the floor = 'T' inches (cm).
 Refer to Table 1 to get the value 'C' that corre-
sponds to the model you are installing
 Subtract the clearance below the heater 'C' from
'T' to get value 'H'.
 Enter this value 'H' on the sign.
Refer to the information for the heater model
being installed in Figure 1 and Table 1 to get
the values for dimensions 'S', 'F' and 'B'.
GP-MSET-EX-6A
SET(U) / ITT(U) Manual
RD: MAY 2009
RL: 06A- BA
Post this sign as instructed above.
8

Advertisement

Table of Contents
loading

Table of Contents