FIGURE 8
BOLTING BURNER TO FLANGED TUBE
FIGURE 9 COUPLER
1
2
FIGURE 10 HANGER / REFLECTOR ORIENTATION HORIZONTAL TO 45
GP-MSET-EX-6A
SET(U) / ITT(U) Manual
RD: MAY 2009
RL: 06A- BA
(NOTE: See Section 9.3 for 'Special Couplers' at first tube
joint: 100,000 x 20 ft & 175 / 200,000 models)
4
1
3
45°
1 Eye Bolt
2 Fifth Nut (Holds Inner Burner to Housing -
Do Not Remove or Loosen)
3 Lock Washers (4) Four
4 Nuts (4) Four Note: Nuts may be shipped
c/w lock-washers as one piece

Insert four burner bolts through the tube
flange, secure tightly with lock washers and
nuts.

Note: A Flange Gasket is not required for
this application

Secure suspension chain to eye bolt to sta-
bilize burner

Align the four burner bolts through flange on
tube, secure tightly with lock washers and
1 Tube
2 Tube Coupler
3 Swaged section of upstream tube
4 End of downstream tube
5 Place the centre of the coupler
over the line of the tube joint
(end of downstream tube)
6 Tighten bolts to 40 ft-lbs.
FOR ANGLE LESS
THAN 45° USE
CHAIN TO BOTH
EYES ON
HANGER
45°
16