RAIS GEO Instructions For Installation, Use And Maintenance Manual page 12

Wood burning stove
Hide thumbs Also See for GEO:
Table of Contents

Advertisement

ENGLISH 
Locate the stove where it is to be installed, it cannot be moved once the 
soapstone has been installed. 
The rear flue connection can be installed after the third row of soapstone 
has been positioned ( Geo 161 only ). 
For top flue connection, remove the marked opening with a plastic or 
rubber hammer. 
Installation up to the ceiling, the easiest  option is to use the Rais sliding 
flue system and adaptor. The steel top plate should be pushed onto the 
flue pipe. 
Adjust the legs so that they are level. 
­ Loosen the counter screw. 
­ Adjust the leg. 
­ Tighten the counter screw. 
Position the soapstone as shown on the diagram and screw them together 
with the enclosed mountings. 
Depending on the choice of flue outlet, you are left with one piece of 
soapstone, either number 7023 or 7033/7036. 
Insert the firebox. 
Ensure that the firebox is centred within the stove body, it must NOT 
touch the soapstone. 
If you are using the rear flue outlet option, ensure that the exit holes are 
aligned.
RAIS ­ manual for Rais Geo 
12 

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Geo 161Geo 126

Table of Contents