2-27. SERVICE POSITION
Preparation: Refer to previous section "DISASSEMBLY", and connect as shown in the figure after each part has been removed.
MAIN BOARD, CLV BOARD
Battry case assembly
Lens block
LCD block
Stand
LCD BOARD
LCD block
Stand
POWER board
Cabinet (L) block
VF BOARD
AC adaptor
(AC-VQ800)
AC in
POWER board
LCD board
2-12
AC adaptor
(AC-VQ800)
AC in
Zoom switch unit
Note : Put an insulating sheet
MAIN board
EVF block
Main control switch unit
MAIN board
CLV board
between MAIN board and
POWER board.
AC adaptor
(AC-VQ800)
AC in
Main control switch unit
VF board
Stand