Control Box Installation - Gates that Open Silver-HD Single Installation Manual

25th anniversary series
Table of Contents

Advertisement

Control Box Installation

1
A
N
GR
W HT
BL
U
N
BR
G
OR
D
RE
BL
K
N
GR
W HT
U
BL
BR
N
G
OR
D
RE
K
BL
M
CO
CO
M
E
CY
CL
FE
TY
SA
EX
IT
OW
AD
SH
E
OS
CL
ED
GE
EN
OP
GE
ED
N
GR
K
BL
RE
D
Remove control box cover.
3
W
Mount control box to post or fence using screws.
5
Twist each end of the gate opener power cable's 7 colored wires.
Feed cable through strain relief nut.
Control Box Installation
W
OR
B
2
M i
Locate control box mounting area. IMPORTANT: Be sure to
mount box at least 3 feet from AC power and 3 feet off the ground.
4
N
GR
T
WH
BL
U
N
BR
G
OR
RE
D
K
BL
GR
N
T
WH
BL
U
BR
N
G
OR
D
RE
BL
K
M
CO
M
CO
E
CY
CL
FE
TY
SA
IT
EX
OW
AD
SH
OS
E
CL
GE
ED
EN
OP
GE
ED
N
GR
K
BL
RE
D
Position batteries in control box as shown. Connect battery leads
from control board to batteries. IMPORTANT: Red wire to (Red
Post) positive and black wire to (Black Post) negative.
6
2
6"
Feed cable 6" into box. Tighten strain relief nut to secure cable.
18
4 '
x .
M a
3 '
n .
n .
M i
3 '
G
G
NE
S
PO
GR
N
T
WH
U
BL
BR
N
G
OR
RE
D
BL
K
N
GR
T
WH
U
BL
N
BR
OR
G
D
RE
K
BL
CO
M
M
CO
c k
CL
E
CY
TY
SA
FE
EX
IT
OW
B l a
SH
AD
E
OS
CL
ED
GE
EN
OP
GE
ED
GR
N
BL
K
D
RE
R e d
G RN
W H
T
BL
U
N
BR
O RG
D
RE
K
BL
G RN
W H
T
U
BL
N
BR
O RG
D
RE
K
BL
M
CO
M
CO
E
CL
CY
TY
FE
SA
IT
EX
O W
AD
SH
O SE
G E
CL
ED
N
O PE
G E
ED
GR
N
K
BL
D
RE
A D
S H
O S
G E
C L
E D
E N
O P
G E
E D
G R
B L
R E
1
3
G
N E
S
P O
O W
E
N
K
D

Advertisement

Table of Contents
loading

Table of Contents