McQuay RAH 047C Installation And Maintenance Manual page 39

Applied rooftop systems air handler
Hide thumbs Also See for RAH 047C:
Table of Contents

Advertisement

Step 3
Assemble side panels A and B to uprights using #10 drill
1
screws supplied. Make certain side panels are flush
against uprights before securing into place.
Fasten bottom panel D to base channel using #10 drill
2
screws and to side panels A and B using #10 screws
supplied.
Set top panel C in place and fasten to side panels A and
3
B using #10 screws and to top panel using #10 screws
supplied.
Figure 43: Step 3 Illustration
#10 Drill
Screw
#10 Screw
McQuay IM 987
Step 4
#10 Screw
Note: Any holes cut in the floor of the unit must be sealed to
Figure 44: Step 4 Illustration
Upright Angle
#10 Screw
Mechanical Installation
Reassemble access door to vestibule by screwing hinges
1
into side panel using screws saved from Step 1. (Access
door must be attached to the vestibule in the same
opening direction as it was on the unit.)
Remove and discard latch handle locking screws and
2
retaining washer. Fasten door latch assembly to side
panel using screws and bushings saved from Step 1.
(Latch must be fastened on the same side as when
located on the unit.)
Fasten upright angles to vestibule using #10 screws
3
supplied.
Seal between unit and vestibule with silicone sealant
4
along top and sides as shown.
prevent water leakage.
Gasketing
Door
Gasketing
Silicone
Sealant
Silicone
Sealant
Door
Prop
Door Latch Assembly
(See Note)
Upright
Angle
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rah 077cRds 800cRds 802c

Table of Contents