McQuay RAH 047C Installation And Maintenance Manual page 27

Applied rooftop systems air handler
Hide thumbs Also See for RAH 047C:
Table of Contents

Advertisement

Phase II. Reassemble cabinet
Reinstall top cap removed in Phase I, Step 1.
1
Caulk (watertight) ends of splice cap.
2
Caulk (watertight) vertical seam.
3
Install #10 screws (provided).
4
Install screws (.25–20 ×.75) removed in Phase I, Step 2.
5
Install splice cover (provided).
6
Figure 31: Reassemble Cabinet
McQuay IM 987
(Figure
31)
See detail
Mechanical Installation
Reinstall top cap
saved in step 1
Caulk
vertical
seam
Install screws
(.25 to 20 × .75)
saved from step 1
Caulk ends
of splice cap
Splice cover,
provided
#10 screws,
provided
Nut clip-on,
provided
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rah 077cRds 800cRds 802c

Table of Contents