Download Print this page

Danfoss DLX 2.0 UL Installation Manual page 24

Solar inverters
Hide thumbs Also See for DLX 2.0 UL:

Advertisement

NOTIC
CE
Follow t
the guideline
ground
ing and tight
2.6.3.
. DC Term
minals
Figure
e 2.10: DC termi
nal blocks
The in
ncoming PV c
conductors s
2.Gro
ounded Term
minal inside th
Figure
e 2.11: Fuse boar
rd in the Stringbo
The P
PV conductor
s go through
+POS
S and –NEG te
erminal block
24
es from the co
onduit manu
tening torque
e.
hall be termi
nated at the
he Stringbox
.
ox
h the DC switc
ch in the Strin
ks in the lowe
er inverter co
ufacturer rega
arding conne
1.Unground
ded Terminal
F1, F2 and F3:
F
: DC fuse holde
F4: Ground fus
F
se holder (GFD
1. Ungrounde
1
ed Terminal: T
for the ungrou
f
unded PV cond
2. Grounded T
2
Terminal: Term
f
for the ground
ded PV conduc
N
N: Receptacle f
for monitoring
between phase
b
es and neutral
N
N-N: Terminal
block for the n
c
conductor.
ngbox, and a
are then term
ompartment.
Installation Gu
uide DLX UL serie
ection,
l and
ers.
DI).
Terminal block
k
ductors.
minal block
ctors.
g the voltage
l.
neutral
minated at the
e
es L00410624-0
01

Advertisement

loading
Need help?

Need help?

Do you have a question about the DLX 2.0 UL and is the answer not in the manual?

Questions and answers