ESAB PCM-875A Installation, Operation And Maintenance Manual page 29

Esab plasmarc mechanized cutting system
Table of Contents

Advertisement

SECTION 3
3.1 General
!
WARNING
3.2 Installation of the PCM-875A Power Console
3.2.1 Equipment Required
PCM-875A Mechanized Plasma Cutting System
Proper installation is important for satisfactory and
trouble free operation. Follow these instructions
carefully.
Failure to follow these directions
carefully may lead to injury or death.
Read this entire manual before
proceeding.
Damage to property or equipment may occur.
A source of clean dry air at 153,4 liters/minute at
5,2 to 5,9 bar. The maximum inlet pressure of the
air filter-regulator is 10,4 bar and should not be
exceeded.
Installation
3-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents