7212 3000 - 08/2003 GB(EN) For the user Users manual Wall-mounted condensing gas boiler Buderus 600 - 11R / 19R / 24R Please read thoroughly before operating the unit...
Page 2
5. Warn building occupants and evacuate the building! 6. Call TRANSCO (under 'GAS' in the telephone directory) from outside the building! Subject to modifications resulting from technical improvements! Boulter Buderus Ltd. • http://www.boulter-boilers.com Operating instructions for Buderus 600 - 11R /19R / 24R • Edition 08/2003...
(58 °C, new building) up to controller, 24 V (80 °C, old building)* Basic setting: Have the specific system settings of the Buderus control system and burner-control unit control panel adjusted by a specialist heating system company. Table 1 Flow temperature Subject to modifications resulting from technical improvements! Boulter Buderus Ltd.
Page 4
If the burner fails to ignite after several unblocking operations, consult a specialist company. Normal heating mode Flashing after three start-up attempts. Table 2 Operational and fault codes Boulter Buderus Ltd. Magnet House Whitehouse Road Ipswich Suffolk, IP1 5JA http://www.boulter-boilers.com...
Need help?
Do you have a question about the 600-11R and is the answer not in the manual?
Questions and answers