Inspection; General Directions; Preparing The Boiler For Inspection - Buderus 600 - 11R Installation And Servicing Instructions

Gas wall hung boiler condensing
Table of Contents

Advertisement

3

Inspection

3
Inspection
3.1

General directions

Do a visual and functional test of the installation.
3.2

Preparing the boiler for inspection

Disconnect the boiler from the mains power supply.
DANGER OF FATAL INJURY
due to electric shock when appliance
casing is removed.
DANGER!
Before removing the appliance case:
disconnect the heating unit at the
emergency OFF switch or the corre-
sponding circuit breaker of the house
power supply.
Ensure that the heating system cannot
be reconnected by accident.
Remove the casing.
NOTE
If the gas supply pipes are to be
disconnected from the burner, the
housing MUST ONLY be removed by a
competent service technician and
checked for tightness on reassembly.
3.2.1 Internal leak test
Disconnect the boiler from the mains power supply.
NOTE
Do not allow the product to come into
contact with the electrical wiring.
3.2.2
Check the combustion chamber and heat
exchanger for pollution
3.2.3
Check the burner
3.2.4
Check the functioning and safety of the flue gas
exhaust
3.2.5
Check the pre-pressure of the expansion vessel
3.2.6
Check the hot water cylinder for leakage
3.2.7
Check the programming of the room thermostat
Buderus • http://www.buderus-domestic.co.uk
40
Installation and servicing instructions for wall-mounted condensing gas boiler Buderus 600 - 11R/19R/24R • 02/2006
Subject to modifications resulting from technical improvements!

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

600 - 19r600 - 24r

Table of Contents