Snow Blower Mounting Frame
Inspect the mounting flange (Item 1) and all welds on the attachment for
wear or damage each time the attachment is removed from the machine.
Inspect the input shaft and PTO driveline for damage (Item 2).
Check the following items at the start of the work day:
• Check for damaged or missing decals. Replace if necessary.
• Replace any worn or damaged parts immediately.
PTO Driveline
Inspect the driveline assembly for wear or damage.
Replace damaged or worn U-joints (Item 1).
Inspect the snap rings (Item 2) for damage or missing. Replace damaged
or missing snap rings.
DAILY INSPECTION
1
1
2
2
1
13
Need help?
Do you have a question about the BRUTUS and is the answer not in the manual?