10.3.3 Evacuation of the equipment
When installing an air conditioner, be sure to evacuate the air inside the indoor unit and pipes in the following
procedures.
1
Connect a charging hose with a push pin to the Low side of a charging set and the service port of the 3-way
valve.
Be sure to connect the end of the charging hose with the push pin to the service port.
o
2
Connect the center hose of the charging set to a vacuum pump.
3
Turn on the power switch of the vacuum pump and make sure that the needle in the gauge moves from
0cmHg (0 Mpa) to -76cmHg (-0.1Mpa). Then evacuate the air approximately ten minutes.
4
Close the Low side valve of the charging set and turn off the vacuum pump. Make sure the needle in the
gauge does not move after approximately five minutes.
Note: BE SURE TO TAKE THIS PROCEDURE IN ORDER TO AVOID REFRIGERANT GAS LEAKAGE.
5
Disconnect the charging hose from the vacuum pump and from the service port of the 3-way valve.
6
Tighten the service port caps of the 3-way valve at a torque of 18N m with a torque wrench.
7
Remove the valve caps of both of the 2-way valve and 3-way valve. Position both of the valves to "OPEN"
using a hexagonal wrench (4mm).
8
Mount valve caps onto the 2-way valve and the 3-way valve.
Be sure to check for gas leakage.
o
Caution
•
If gauge needle does not move from 0cmHg (0Mpa) to -76cmHg (-0.1Mpa), in step 3 above take the following
measure:
•
If the leak stops when the piping connections are tightened further, continue working from step 3.
•
If the leak does not stop when the connections are retightened, repair location of leak.
•
Do not release refrigerant during piping work for installation and reinstallation. Take care of the liquid refrigerant,
it may cause frostbite.
10.3.4 Connect the cable to the outdoor unit
1
Remove the control board cover from the unit by loosening the screw.
2
Connecting cable between indoor unit and outdoor unit shall be approved
polychloroprene sheathed 4 x 1.5mm
flexible cord, type designation 245 IEC 57 or heavier cord.
3
Secure the cable onto the control board with the holder (clamper).
4
Attach the control board cover back to the original position with screw.
5
For wire stripping and connection requirement, refer to instructions 5 of indoor unit.
10.3.5 Piping insulation
1
Please carry insulation at piping connection portion as mentioned in Indoor/Outdoor Unit Installation Diagram.
Please wrap the insulated piping end to prevent water from going inside the piping.
2
If drain hose or connecting piping is in the room (where dew may form), please increase the insulation by
using POLY-E-FOAM with thickness 6mm or above.
Indoor unit
OPEN
Vacuum
pump
2
(1.0 ~ 1.75HP) or 4 x 2.5mm
Terminals on the outdoor unit
Colour of wires
Terminals on the indoor unit
Liquid side
Two-way valve
Close
Gas side
Three-way valve
Close
Hi
Lo
CLOSE
1
2
3
1
2
3
25
Outdoor unit
2
1
2
(2.0 ~ 2.5HP)
Indo or and outdoor
cable conn ection
Indo or Unit
Terminal
Board
Earth Wire
3
long er than
others AC
wires for
safety reason
Holder