6. Commissioning

6.1 Menu-Commissioning

6.2 Switching on

396532 05.11
Danger! Danger of life by improperly performed work!
Commissioning must only be carried out by an GasSafe heating engineer! The
heating specialist checks the tightnesss of pipelines, the correct functioning of all
regulating, control and safety installations and measures the combustion values.
In case of incorrect operations exists the danger of considerable damage to per-
sons, environment and property!
During first commissioning, the menu Commissioning is showing up one-time.
1.
Select Language and confirm by pressing OK
2. Select Year and confirm
3. Set Date and confirm
4. Set Time and confirm
5. Finalize by pressing OK
Note: If the menu commissioning is interrupted by pressing ESC, the menu is
showing up again during the next switch-on of the device.
Danger! Danger of scalding! Hot water may exit from the blow pipe of the safety
valve.
1.
Switch on boiler electrical isolation
2.
Open gas shut-off device (1) and the water shut off valves (2 and 3)
3. Open front panel cover and switch on operating switch on the front panel of
the boiler
Paramount three 30-115 kW
Commissioning
33