Supply & Delivery; Figure 2.1 Boiler Packaging - Hamworthy MILBORNE381 Series Design Installation, Commissioning And Operating Instructions

Wall hung, pre-mix, condensing, modular boilers
Table of Contents

Advertisement

2.0 SUPPLY AND DELIVERY
The boiler is despatched to site as a pre-assembled and tested unit. Each boiler is delivered by a tail lift vehicle
and lowered to ground level. It is the installers responsibility to convey the boiler to the plantroom.
Figure 2.1 - Boiler Packaging
NOTE: The boiler is packaged within a cardboard carton. However, when handling and manoeuvring the
boiler care must be taken to avoid damage to the casing.
The boiler must be kept upright during handling. Care must be exercised to avoid toppling the boiler as this will
result in damage.
Warranty
Full warranty assistance will be covered when the appliance is commissioned by Hamworthy Heating Ltd, see
Terms & Conditions for full details.
Hamworthy Heating Ltd will not accept any liability resulting from damage due to tampering, improper
use, handling, installation errors, operation and maintenance. It is important to check for damage upon
receipt of product, which if found must be notified to Hamworthy Heating Ltd immediately.
In the event of failure or breakdown, isolate the equipment and contact Hamworthy Technical Support
Tel - 0845 450 2866
HAMWORTHY HEATING LTD
2
MILBORNE
500001130/J

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Milborne 501 seriesMilborne 381 series

Table of Contents