Download Print this page

Keystone Stoker Zero Clearance Installation Instructions Manual page 3

Zero clearance stove

Advertisement

Zero Clearance Stove
Clearances to Combustible Walls On Either Side
Locate thermostat in an area where heat from stove can be freely reached. Mount
plastic wall plate of thermostat. Connect thermostat wires to screws on lower
portion of wall plate. Run thermostat wires to Relay on stove and connect wires to
terminals marked T.T. (note: color coding of thermostat wires is unimportant.) Be
sure to snap thermostat onto wall plate.
Stove has 2 cycles, demand and idle. Demand cycle (gear motor activated)
Thermostat call for heat activates gear motor to feed coal while forcing air through
grate to create a hotter fire. Fire bed should be close to lower end of grate after a
continuous run of 20 to 30 minutes. If fire bed (hot coals) is too small, increase
coal feed. Loss of fire may occur during idle cycles due to lack of coal feed.
Timer activates stoker unit for a preset period to maintain fire in warmer weather.
Timer is a factory set to run approximately 1 minute every 10 minutes. This is
adjustable, see instructions packed with timer.
IDLE CYCLE During the periods when thermostat or timer are not activating
gear motor, exhaust motor and combustion motor will continue to run, but gear
motor will not run to drive coal onto grate. This will allow fire bed to shrink to
small maintenance fire.
Plug power cord into 115V outlet. Turn up thermostat. Start fire.
2

Advertisement

loading