Download Print this page

Keystone Stoker Zero Clearance Installation Instructions Manual page 2

Zero clearance stove

Advertisement

Zero Clearance Stove
Safety inspection of a venting system should be performed before and after
installing your new stove. Procedures to follow are those recommended by the
National Fuel Gas Code, ANSI Z223.1 or refer to local codes or ordinances.
Plan the vent system layout before installation to avoid the possibility of accidental
contact with concealed wiring or plumbing inside walls.
Draft adjustment must be made to ensure stove efficiency. This is checked at hole
provided to right of ash door, by use of a draft gauge.
No barometric draft control is required.
After determining the location of stove, cut a hole through exterior wall 1" larger
than the outer diameter of stove pipe. Seal the base plates, inner and outer with a
bead of high temperature silicone sealant, or equivalent. Put stove into permanent
position to obtain measurements.
From outside of home, insert 4" pipe onto exhaust air tube and secure with screws.
Leave 6" extension beyond outside of home, cut excess pipe off. Insert 6" pipe
through wall onto inlet air tube and secure with screws. Allow 6" pipe to be flush
with outside of home. Seal perimeter of 6" pipe with sealant.
Place 4" tee on exhaust pipe. Place 4" tee cap on bottom of 4" tee. Place 4"
chimney cap on top of 4" tee. Secure with screws.
Clearances for
Approved Floor
Protector
1

Advertisement

loading