Modine Manufacturing POR oil-fired unit Installation Instructions Manual

Modine Manufacturing POR oil-fired unit Installation Instructions Manual

Oil fired unit heaters

Advertisement

4-112.3
September, 2008
Oil Fired Unit Heaters

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the POR oil-fired unit and is the answer not in the manual?

Questions and answers

Summary of Contents for Modine Manufacturing POR oil-fired unit

  • Page 1 4-112.3 September, 2008 Oil Fired Unit Heaters...
  • Page 2: Design Features

    DESIGN FEATURES Maximum Performance, Comfort, and Efficiency Durable Attractive Casing Design Modine model POR oil-fired unit heaters offer an efficient and The casing is treated for protection against corrosion and reliable means of heating, particularly in regions where supplies painted with an attractive, Modine Gray-Green, baked polyester of other fuels, such as natural gas, may be unavailable, powdercoat paint finish.
  • Page 3 DESIGN FEATURES AND PERFORMANCE DATA Superior Heat Exchanger Life Expectancy Efficient Combustion Long life is due in part to the roll-formed design of the heat Combustion products heat flow through the heat exchanger can exchanger. Stresses caused by thermal expansion and be traced by the arrows in the cross-sectional view in Figure 3.2.
  • Page 4: Dimensions And Accessories

    The maximum inlet pressure is 60 PSIG. Fuel Oil Filter – Protects oil burner from foreign particles. As Modine Manufacturing Company has a continuous product improvement program, it reserves the right to change design specifications without notice. Distributed By:...
  • Page 5 C C o o m m m m e e r r c c i i a a l l H H V V A A C C R R D D i i v v i i s s i i o o n n • Modine Manufacturing Company • 604 Liberty Lane • West Kingston, RI 02892 &...
  • Page 6: Installation Instructions

    THIS MANUAL IS THE PROPERTY OF THE OWNER. PLEASE BE SURE TO LEAVE IT WITH THE OWNER WHEN YOU LEAVE THE JOB. Modine Manufacturing Company has a continuous product improvement program, and therefore reserves the right to change design and specifications without notice.
  • Page 7: Installation

    INSTALLATION – CAS-2B Field Control AIRBOOT™ Outside Combustion Air Kit Step 2. Assembly/Installation of the VRV Assembly/Installation The recommended procedure for assembly and installation Purpose of the Vacuum Relief Valve (VRV) is described as follows: The VRV is installed to provide a secondary opening for Step 1 - AIRBOOT™...
  • Page 8 INSTALLATION – CAS-2B Field Control AIRBOOT™ Outside Combustion Air Kit Step 7. Burner Start-Up and Adjustment Caution: DO NOT start the burner when excess oil has accumulated in the chamber, when the furnace or boiler is HORIZONTAL LEVEL ACROSS full of oil vapor, or when the combustion chamber is very hot. PIVOT POINTS After the installation is complete, set the initial AIRBOOT™...
  • Page 9 Commercial Products Group • Modine Manufacturing Company • 1500 DeKoven Avenue • Racine, Wisconsin, USA 53403-2552 Phone: 1.800.828.4328 (HEAT) • www.modine.com -530 © Modine Manufacturing Company 2008 11/08 Litho in USA...

Table of Contents