10.1 Electrical Connection
Take the previously laid electrical cable and route along the
left hand side of the tank module through the two grommets
and the cable ties and across to the installers interface as
shown in diagram 10.1.
Take the electrical cartridge from the loose items pack.
Remove the securing screw to open the cartridge.
NOTE: There are two screws supplied loose in the electrical
cartridge, these will be required to secure the cartridge into
the electrical interface housing.
Slacken the two screws of the cable strain relief in the
electrical cartridge, see diagram 10.2.
Route the mains supply and systems cables through the
strain relief and connect to the relevant plug dependant upon
your choice of system controls, refer to relevant sections 10.2
and 10.3.
Initially, if system controls are not available then fit a wire
link between "L" and "R", this will allow the boiler to run
continuously on heating.
Fit electrical cartridge into the interface housing on completion
of the wiring, see diagram 10.3.
Secure with the two cartridge retaining screws provided in the
cartridge body.
CABLE
TIES
CABLE
TIES
GROMMETS
CABLE TIES
10 Electrical Connection
ELECTRICAL
CABLES
Diagram 10.1
ELECTRICAL
CARTRIDGE
CABLE STRAIN
SECURING
RELIEF
SCREW
ELECTRICAL
CARTRIDGE
Diagram 10.2
RETAINING
SCREW
(2 OFF)
Diagram 10.3
25
Need help?
Do you have a question about the Ultrapower 100sxi and is the answer not in the manual?
Questions and answers