Position
Position of the flue terminal
Horizontal flues
directly below an opening, air brick,
A
opening windows
B
above an opening, air brick, opening windows
horizontally to an opening, air brick, opening
C
windows
D
below gutter, drain/soil pipe
E
below eaves
F
below a balcony or car port
G
from vertical drain pipes and soil pipes
H
from internal/external corners
H*
to a boundary alongside the terminal
I
above adjacent ground or balcony level
J*
from surface or a boundary facing the terminal
12
3 Evacuation of Combustion Gas
mm
300
300
300
25
25
25
25
25
300
300
600
Position
Position of the flue terminal
from opening (door/window) in car port
L
into dwelling
M
vertical from a terminal
N
horizontally from a terminal
Vertical flues
P
from another terminal
Q
above roof level
R
from adjacent opening window
S
from adjacent wall to flue
(*) These dimensions comply with the building regulations,
but they may need to be increased to avoid wall staining and
nuisance from pluming depending on site conditions.
Diagram 3.2
mm
1200
1500
300
600
300
1000
300
Need help?
Do you have a question about the Ultrapower 100sxi and is the answer not in the manual?