Installing Aktiv Modules - Linn MAJIK Service Manual

Control amplifier and preamplifier
Hide thumbs Also See for MAJIK:
Table of Contents

Advertisement

REVISION 14: MAJIK and WAKONDA
INSTALLING AKTIV MODULES IN THE MAJIK / WAKONDA

INSTALLING AKTIV MODULES

Parts Required:
1 x Set Aktiv Modules. (See contents list in box.)
Tools Required:
1 x No 2 Pozi (or Supa) screwdriver
Antistatic work station
Before starting, you must ensure that you have a clean workbench and take
the necessary anti-static precautions. Always wear an anti-static wrist strap.
Refer to the Service Manual (5.8) for full details of the necessary working
practices. Always disconnect the MAJIK/WAKONDA from everything, ESPE-
CIALLY MAINS, before fitting a SNEAKY module.
1
Remove the sleeve from the MAJIK and place the amplifier with the
back panel facing you.
2
Remove the 2 screws on the back panel and remove the SNEAKY
blanking plate.
Give the blanking plate to the customer to retain for future use.
3
Take 2 of the wiring harnesses, which
have a 5 way connector at one end and
a 2 and 3 way connector at the other
end.
Fit the 2 and 3 way connectors to the
MAJIK main board.
Make sure they are pressed fully home.
4.
Fit the two long
standoffs to the
MAJIK main
board.
Make sure the
standoffs are
fitted the correct
way round.
Page 5.610
Copyright © 1995 by Linn Products Limited. All Rights Reserved.
Time required:
30 min, approx.
right
left
Sept 95

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wakonda

Table of Contents