MTU 12 V 2000 M72 Operating Instructions Manual page 147

Diesel engine
Hide thumbs Also See for 12 V 2000 M72:
Table of Contents

Advertisement

Fuel prefilter
– Differential pressure gauge  
– Check and adjustment
– Draining
 92
– Filter element  
– Replacement
 95
Fuel prefilter –
Flushing 93
Fuel system –
Venting 88
Fuel treatment system
– Start-up
 49
Fuel treatment system
– Shutdown
 57
– Switching on
 52
G
General
conditions 7
H
HT coolant pump
– Relief bore check
 119
I
Injector
– Removal and installation
Injector –
Replacement 85
Installation locations for SOLAS
Intercooler – Checking condensate drain line for coolant
discharge and
obstruction 97
M
Maintenance and repair work
– Safety requirements
 11
MTU contact
persons 142
O
Operational
checks 51
P
Personnel and organizational
Plant
– Cleaning
 58
Product
description 18
Pump capacity
– Check
 128
Putting the engine into operation after scheduled out-of-
service period
 46
R
Raw water pump – Relief bore
S
Safety
instructions 16
Sensors, actuators and injectors
– Overview
 26
Service indicator
– Signal ring position check
Service
partners 142
SOLAS shielding -
Installation 65
SOLAS shielding as per MTN 5233 –
 91
 86
shielding 66
requirements 8
check 122
 100
Installation 64
Starter
– Condition check
 101
Starting the
engine 53
Startup and operation
– Safety regulations
 10
Stopping the
engine 54
T
Tasks
– After extended out-of-service periods
Tasks after extended out-of-service periods (>3 weeks) 
47
Transport 9
Troubleshooting 61
– Fuel treatment system
 60
V
Valve clearance – Check and
W
Water drain valve
– Check
 125
Water level probe (3-in-1 rod electrode)
– Check
 127
Wiring - engine
– Check
 131
M015650/03E 2011-10 | Appendix B | 147
 47
adjustment 81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

16v 2000 m72

Table of Contents