Testing The Grill - Ortech TR-100 User Manual

Digital grill control
Table of Contents

Advertisement

Connect Control's
Black Wire to
AC Power
Organize Wire Lead
Attach Hopper
Bottom Panel

Testing the Grill

Prepare the Grill
Turn the Grill On
Check the Draft Fan
Check the Igniter
Check the Fuel Auger
Turn the Grill Off
Reassemble the Grill
If necessary, use the tie wrap to tie back the temperature
detector wire lead and the control's wiring harness to ensure
they do not interfere with the draft fan and other grill
components.
If your grill is equipped with a hopper bottom panel, attach
the panel, install and tighten the screws.
Set the Cook Control to the Off position. Open the cook lid
and remove the internal grill, the drip pan, and the heat
baffle to expose the firepot.
Plug the grill's AC power cord into an outlet. Turn the Cook
Control switch to the Smoke position.
Place your hand above the firepot and verify air movement
from the draft fan.
Verify the igniter located in the base of the firepot is getting
hot. DO NOT TOUCH THE IGNITER!
Verify that pellets are flowing into the firepot. If the pellet
hopper is empty, open the hopper lid, look inside the hopper
and verify the auger is turning.
Set the Cook Control to the Off position.
If the grill passes the tests above, reassemble the grill. If
not, refer to the "Troubleshooting" section of this manual.
9
AC Power Plug

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents