Tube Clamp Package Installation; Coupling And Tube Assembly - Roberts Gorden GordonRay BH-40 Installation, Operation & Service Manual

The economical unitary infrared heater
Table of Contents

Advertisement

BH-S
I
, O
ERIES
NSTALLATION
PERATION AND
Step 6.2 Tube Clamp Package Installation
Description
Part Number
Tube Clamp Package
01318901
Tube Clamp
01396801
Bolt
97113940
Flat Washer
95211600
Nut
92113900
Step 6.3 Coupling and Tube Assembly
A
Close coupling
with tab.
Open
Closed
C
Insert tubes into coupling.
Tube
16
S
M
ERVICE
ANUAL
Tab
Orient coupling so that
the impact block is in the
2:00 or 10:00 o’clock
positions
Tube
Tube Clamp
Flat
Washer
Nut
(torque 120 in/lb
13.56 Nm)
B
Start slide bar/coupling lock
onto coupling.
3" (8 cm) to
4" (10 cm)
D
Tighten coupling to join tubes.
Description
Part Number
Coupling
Slide Bar/Coupling Lock
Tube
Bolt
Slide Bar/Coupling Lock
Wide End
Coupling
Slide Bar/Coupling Lock
Coupling
Tube
01329600
01329700
91409XXX

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents