Summary of Contents for Roberts Gorden Gordonray BH Series
Page 1
GordonRay The Economical, Unitary Infrared Heater Job: Location: Engineer: Gas Specs: Date: QTY. MODEL NO. BH QTY. MODEL NO. BH QTY. MODEL NO. BH QTY. MODEL NO. BH TOTAL INPUT Before installation and operation of heating equipment, read and understand the Applications, engineering and detailed guidance on systems design, installation and product performance is available upon request.
ROBERTS GOR DON ® BH-S ERI E S UBM IT TAL HE E T STANDARD PARTS LIST Contents of BH-Series Burner Carton Part No. Description 071XXXXX BH-Series Burner (Rate and Fuel Varies) 90709700 Blower Assembly with Cord 02568200 Gasket (Burner to Burner Tube) 90709801 Gasket (Blower to Burner) 170101NA Installation Manual...
ROBERTS GORDON ® BH-S ERI E S UBM IT TAL HE E T GENERAL SPECIFICATIONS Material Specification Reflectors .024 Aluminum Heater Specifications Ignition Fully automatic spark ignition with safety shut-off. General Specifications for BH-Series heaters are as follows: Heat Input Rate Model (BTUH X1000)
ROBERTS GOR DON ® BH-S ERI E S UBM IT TAL HE E T CLEARANCES TO COMBUSTIBLES NOTE: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
ROBERTS GORDON ® BH-S ERI E S UBM IT TAL HE E T NOTE: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
ROBERTS GOR DON ® BH-S ERI E S UBM IT TAL HE E T NOTE: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
ROBERTS GORDON ® BH-S ERI E S UBM IT TAL HE E T NOTE: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
ROBERTS GOR DON ® BH-S ERI E S UBM IT TAL HE E T BH-SERIES ASSEMBLY OVERVIEW Major Component Descriptions Burner with Tube Gasket Must be installed with the flame observation window facing down. Burner Tube Supplied in 10 Burner tube is always the first tube after the burner.
ROBERTS GORDON ® BH-S ERI E S UBM IT TAL HE E T Tube Clamp Package Installation Description Part Number Tube Clamp Package 01318901 Tube Clamp 01396801 Bolt 97113940 Flat Washer 95211600 92113900 Coupling and Tube Assembly Close coupling with tab Insert tubes into coupling BEFORE IN STALLATI ON AND OPER ATI ON OF HEATI NG EQUIPMENT, READ AND U NDERSTAND T HE INSTALL AT ION, OPERATIO N AND SERVICE MANUAL .
ROBERTS GOR DON ® BH-S ERI E S UBM IT TAL HE E T Reflector, U-Clip and Reflector Support Installation The pictorial drawings of the heater construction in this section are schematic only and provide a general guideline of where hangers, reflector supports and U-clips are to be installed.
ROBERTS GORDON ® BH-S ERI E S UBM IT TAL HE E T Elbow Package Configuration Elbow Installation Description Part Number Elbow Package 02718702 90° Elbow 01335801 Coupling 01312700 Reflector End Cap 02750800 Reflector Joint Piece 02750900 U-Clip Package 91107720 Elbow Installation (continued) Reflector Joint Installation BEFORE IN STALLATI ON AND OPER ATI ON OF HEATI NG EQUIPMENT, READ AND U NDERSTAND T HE INSTALL AT ION, OPERATIO N AND SERVICE MANUAL .
ROBERTS GORDON ® BH-S ERI E S UBM IT TAL HE E T REFLECTOR SIDE EXTENSION Bracket Installation Description Par t Number Reflector Side Extension Package Reflector Side Extension Retainer Clips Sheet Metal Screws Order Separately Reflector Side Extension Side Reflector Installation BEFORE IN STALLATI ON AND OPER ATI ON OF HEATI NG EQUIPMENT, READ AND U NDERSTAND T HE INSTALL AT ION, OPERATIO N AND SERVICE MANUAL .
ROBERTS GORDON ® BH-S ERI E S UBM IT TAL HE E T Frame Shield Installation Reflector Side Extension Installation Distance "A" Minimum Maximum Par t No. 2" (4 cm) 6" (15 cm) 01370408 6" (15 cm) 10" (26 cm) 01370412 10"...
ROBERTS GOR DON ® BH-S ERI E S UBM IT TAL HE E T ONE-FOOT DECORATIVE GRILLE INSTALLATION One-Foot Decorative Grille Bracket Description Part Number Bracket Decorative Grille Description Part Number Decorative Grille 8’ x 1’ Joint Piece and Reinforcement Description Par t Number Joint Piece...
ROBERTS GORDON ® BH-S ERI E S UBM IT TAL HE E T VENTING Horizontal Ventilation 4" (10 cm) Pipe Description Part Number Vent Terminal (Comb. Wall) Vent Terminal (Non-Comb Wall) 02537801-XX Wall Thimble Vertical Ventilation 4" (10 cm) Pipe Description Part Number Vent Cap 4"...
ROBERTS GOR DON ® BH-S ERI E S UBM IT TAL HE E T OUTSIDE COMBUSTION AIR SUPPLY Vertical Outside Air Supply for Single Heater Installation Description Part Num ber Vent Cap 4" (10 cm) 90502300 Horizontal Outside Air Supply for Single Heater Installation Description Part Num ber Vent Cap 4"...
ROBERTS GORDON ® BH-S ERI E S UBM IT TAL HE E T Vertical Outside Air Supply for Double Heater Installation Description Part Num ber Vent Cap 6" (15 cm) Horizontal Outside Air Supply for Double Heater Installation Description Part Number Vent Cap 6"...
ROBERTS GORDON ® BH-S ERI E S UBM IT TAL HE E T THE ROBERTS GORDON GORDONRAY ® LIMITED WARRANTY ROBERTS-GORDON WILL PAY FOR: Within 42 months from date of shipment from Roberts - Gordon, replacement parts will be prov ided free of charge for any part of the c ontroller which fails due to a manufacturing or material defect.
Need help?
Do you have a question about the Gordonray BH Series and is the answer not in the manual?
Questions and answers