Integrated Cluster Bus Cabling - IBM zSeries 800 Installation Manual

Physical planning
Hide thumbs Also See for zSeries 800:
Table of Contents

Advertisement

Level 04a, June 21, 2004
cluster bus channels, you will have to place connected devices closer than 10
meters to allow for cable routing between equipment, including the distance under
your raised floor and vertical routing to the physical cable connectors in the system
frames.
Figure 6-11. Integrated Cluster Bus Cabling
You must plan the floor placement of connected equipment carefully, subtracting the
appropriate amount of cable length for your particular situation.