CAMBRIDGE Olde English Reference Manual page 6

Pre-packaged / pre-cut olde english wall outdoor fireplace kit
Hide thumbs Also See for Olde English:
Table of Contents

Advertisement

Olde English Wall Outdoor Fireplace Kit w/Surround
Fireplace Concrete Pad Construction:
Call 811 for information on underground utility marking. Select desired location and exca-
vate 88" L x 60" W x 12" D area for concrete pad. Install four 8" diameter concrete tubes to
frost-line as per local code. Fill excavated area with approximately 6" of ¾" clean gravel,
compacting every 3". (Do not fill concrete tubes with gravel). Frame remaining 4" with
2"x4" lumber to create a level pad. (Be sure 2"x4" wood frame is perfectly level, front to back
and side to side) See attached drawing for details of steel reinforcement rod placement. Fill
concrete tubes and 2"x4" wood frame with a 4,000 psi strong concrete mix.
* Allow concrete pad to cure for 48 hours.
Construccion Concreta del Cojín de la Chimenea:
Llame al 811 para obtener informaci n sobre la utilidad de metro marcado. Seleccione la ubi-
caci n deseada y excavar 88" de largo x 60" W x 12" D área de plataforma de concreto. In-
stale cuatro 8" de diámetro de los tubos de hormig n a las heladas-line como por el c digo lo-
cal. Llene la zona excavada con aproximadamente 6" de ¾" limpia grava, compactando cada
3". (No llene los tubos de concreto con grava). Marco restantes 4" con 2" x4"de madera para
crear una plataforma de nivel. (Asegúrese de 2" x 4" marco de madera está perfectamente
horizontal, de adelante hacia atrás y de lado a lado) Véanse los detalles del dibujo para la
colocaci n de varillas de acero de refuerzo. Relleno de concreto y tubos de 2" x4" marco de
madera con una mezcla de concreto 4000 PSI fuerte.
* Deje que la almohadilla para curar por un mínimo de 48 horas.
Cambridge Pre-Packaged / Pre-Cut
5
2011

Advertisement

Table of Contents
loading

Table of Contents