FRAMING FOR A((ESSORY WALL SLEEVE (WS9XX)
Mounting
Holes
""it-­
(Drilled
by
InstaDer!
Wall Sleeve must extend a minimum of
%'
beyond outside wall to allow
for proper
caulking.
MAIN STUD
HEADER -4" ,,4" OR
DOUBLE 2"" 4" ON EDGE
/
ADJUST FRAMING TO
SECURE THIS DIMENSIoN
FINISHED FLOOR
- - f l r -
SUB-FLOOR
Wall sleeve opening height should be
squared with wall sleeve opening width.
JACK STUD
FASTENING WALL SLEEVE
When installed in an opening, the Wall Sleeve must be horizontally level (side-to-side) and pitched
y..
bubble to the outside.
(NOTE: To ensure unit's maximum efficiency, DO NOT over- or under-pitch.)
INSTALLATION NOTES
1. If Sub·base (PTSB***E) is installed, allow minimum 3%" height clearance and maximum 5" height clearance between wall sleeve and floor,
allow minimum 2%" protrusion from a finished wall.
See Note 4 if using hydronic units.
2. Drain Kit (DK900D) shipped separately. Can be mounted either right side, left side or bottom of sleeve.
If
mounted to bottom of sleeve, allow
2" height clearance from floor to bottom of sleeve.
3. For UL approval, 265V units must use Amana'" brand Sub·base (PTSB***E) or Amana'" brand Hard Wire Kit (PTPWHWK4). Overcurrent
protection on 265V units must be by cartridge-style time delay fuses, which are included and factory·installed on the Amana'" brand 265V
chassis.
4.
If Hydronic Kit (HWK03 or HVK03) is installed, Wall Sleeve must extend exactly 3" into the room from the finished interior wall. If using the
Amana'" brand Sub·base (PTSB'·*E), only the minimum
3Y."
height clearance between wall sleeve and floor is permissible. Unit must also
be operated with a remote-mounted thermostat.
5. If Duct Kit (MDK02B) is installed, allow a minimum of 2%" into the room from the finished interior wall.