Download Print this page

Installing Your Switch - Draytek VigorSwitch G2260 Quick Start Manual

24-2 giga port l2 managed switch
Hide thumbs Also See for VigorSwitch G2260:

Advertisement

Installing Your Switch

A hierarchical network with minimum levels of switch may reduce the timing
delay between server and client station. Basically, with this approach, it will
minimize the number of switches in any one path; will lower the possibility of
network loop and will improve network efficiency. If more than two switches
are connected in the same network, select one switch as Level 1 switch and
connect all other switches to it at Level 2. Server/Host is recommended to
connect to the Level 1 switch. This is general if no VLAN or other special
requirements are applied.
All switch ports are in the same local area network.
For other examples of hardware installation, please refer to User's Guide for
detailed information.

Advertisement

loading