Download Print this page

Installing Your Switch - Draytek VigorSwitch P2261 Quick Start Manual

Poe 24+2 giga port l2 managed switch
Hide thumbs Also See for VigorSwitch P2261:

Advertisement

Installing Your Switch

A hierarchical network with minimum levels of switch may reduce the timing
delay between server and client station. Basically, with this approach, it will
minimize the number of switches in any one path; will lower the possibility of
network loop and will improve network efficiency. If more than two switches
are connected in the same network, select one switch as Level 1 switch and
connect all other switches to it at Level 2. Server/Host is recommended to
connect to the Level 1 switch. This is general if no VLAN or other special
requirements are applied.
The connection among IP Phone, Access Point and VigorSwitch
Each port can support 30.8W power; the total power supply can reach to 185W.
For other examples of hardware installation, please refer to User's Guide for
detailed information.
VoIPon www.voipon.co.uk sales@voipon.co.uk Tel: (0)330 088 0195 Fax: +44 (0)1245 808299

Advertisement

loading