Download Print this page

Cub Cadet 19A20001100 Operator's Manual page 5

33-inch wide cut grass bag kit

Advertisement

Assembling the Grass Bag
1.
Place grass bag [A] over chute assembly [B]. See Fig. 8.
2.
Use the cable tie [I] to secure bag to chute assembly by
inserting the cable tie into hole in bag and pulling through.
Make sure cable is positioned so it ties bag around
indented groove (over flange) of chute. See Fig. 8. Pull
cable tight with pliers.
I
Figure 8
Attaching the Rod Hanger
1.
Insert rod hanger [D] into the opening in the rod assembly
[C]. See Fig 9.
2.
Slide the tabs on the grass bag over the bag hanger rod.
See Fig. 9.
D
C
Figure 8
B
A
Attaching the Grass Bag Assembly
(newer Style Deck)
1.
Lift the chute deflector on the deck back towards engine.
See Fig. 9.
2.
Place the bottom lip of the chute/grass bag assembly into
the lip on the deck. See Fig. 9.
3.
Place the tab of the chute/grass bag assembly into the
bracket on the deck. See Fig. 9.
4.
Lift chute/grass bag to position hole in chute over stud
on the deck. The bracket on the chute will hold the chute
deflector into an upright position. See Fig. 9.
5.
Pull the strap over the tab on the deck. See Fig. 9.
4
Figure 9
s
ectiOn
1
2
3
5
2 — a
& s
-u
sseMbly
et
p
5

Advertisement

loading