Magnum 6Kq Managed Field Switch Port Modules; Inspecting The Package And Product; 6Kq Modules; Www Garrettcom Com - GarettCom Magnum 6KQ Installation And User Manual

Managed field switch
Table of Contents

Advertisement

Magnum 6KQ Managed Field Switch Installation and User Guide
5.0

Magnum 6KQ Managed Field Switch Port Modules

This chapter describes each Port Module (PM), including appearance,
functionality, and status displays.
5.1

Inspecting the Package and Product

This section applies only to Port Modules shipped as separate items, i.e., 6KQ
PMs that are not factory installed.
installing a 6KQ PM; notify the carrier of any damage you believe occurred
during shipment. Inspect the contents of this package for any signs of damage
and ensure that the items listed below are included.
The package should contain:
PM(s) from the shipping container. Be sure to keep the shipping container
should you need to ship any of the PMs separately at a later date. In the event
there are items missing or damaged, contact your supplier. If you need to return
the unit, use the original shipping container if possible. Refer to Chapter 5 for
specific return procedures.
5.2

6KQ Modules

An important feature of the Magnum 6KQ is the use of Port Modules for
flexible mixed-media connectivity to RJ-45 copper and various fiber media. The
first four ports (1,2,3 & 4) of the Magnum 6KQ Switches are fixed RJ-45 copper
ports with dual-speed 10/100Mbps auto-negotiating capability. Additionally the
switch can accept up to three Port Modules to provide the user with up to 12
additional ports (16 total) providing a wide selection of Ethernet copper and
fiber media connections with 10, 100 and 1000Mbps capability and up to 70km.
Note: The 6KQ Port modules are not identical to the port modules used in other 6K
products such as the 6K25e and 6K16V. For information about other 6K
products, please see the applicable manual. For a list of 6KQ Port Modules,
refer to Section 1.2

www GarrettCom com

.
Examine the shipping container for obvious damage prior to
1 or more 6KQ Port Moduless
Installation instructions with illustrations
Observing proper ESD grounding procedures, remove the 6KQ
.
35
(04/07)

Advertisement

Table of Contents
loading

Table of Contents