Jacuzzi Summer Rain 2 Wall and 3 Wall Installation And Operating Instructions Manual page 23

2 wall & 3 wall walk-in shower systems
Table of Contents

Advertisement

3 WALL: TOWER AND CURVED GLASS INSTALLATION
STEP 9
Secure the rails.
STEP 10
Tighten the tower base bolt. Two shut-off valves are
provided. To hook up supply lines, unscrew valves from
braided line. Using thread sealant, screw valve to stub
outs at bottom of tower. Then reconnect braided line
using provided gasket. Do not twist or kink supply lines
when connecting.
COLD
BOLT
STEP 11
Install cover cap on wall post.
STEP 12
Install glazing gasket on curved glass wall post on the
outside. Note orientation of gasket. Soapy water may
help to insert the glazing gasket. On the inside of
enclosure, apply sealant the entire length of glass and
wall post as well as the entire length of glass and tower.
SHUT OFF
VALVES
(PROVIDED)
WALL POST
HOT
GLAZING GASKET
GLAZING
GASKET
21
COVER CAP
TOWER TOP PLATE
APPLY
SEALANT
GLASS
INSIDE OF
ENCLOSURE
APPLY SEALANT
INSIDE OF
ENCLOSURE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Summer rain

Table of Contents