Jacuzzi J-SHOWER TOWERTM Installation And Operating Manual

Jacuzzi j-shower towertm operating manual

Advertisement

J-SHOWER TOWER
ENCLOSURE-Siena
, Merano
INSTALLATION AND OPERATING MANUAL
R
BATH
WHIRLPOOL

Advertisement

Table of Contents
loading

Summary of Contents for Jacuzzi J-SHOWER TOWERTM

  • Page 1 ™ J-SHOWER TOWER ™ ™ ENCLOSURE-Siena , Merano INSTALLATION AND OPERATING MANUAL BATH WHIRLPOOL...
  • Page 3: Table Of Contents

    Important The bathtub must be installed per installation instructions D884000 for the Merano™ or E160000 for the Siena™. Follow the instructions to ensure that proper framing has been provided to support the J-Shower Tower. Finishing materials must be waterproof and sealed so that spray and condensation do not cause moisture damage. NOTE: The J-Shower Tower has been partially pre-assembled for your convenience during installation.
  • Page 6: Shower Tower Hardware Identification Chart

    Shower Tower Hardware Identification Chart The diagrams for these fasteners are shown actual size for fast identification. HARDWARE H1 BOLT QTY.-8 QTY.-8 SCREW QTY.-8 WASHER QTY.-8 QTY.-3 WASHER QTY.-10 SCREW QTY.-3 QTY.-1 SCREW QTY.-7 SCREW QTY.-11 SLOT COVER FASTENER QTY.-6 10 X32 WASHER HEX NUT...
  • Page 7 Shower Tower Hardware Identification Chart The diagrams for these fasteners are shown actual size for fast identification. WATER INLET HARDWARE WALL BAR HARDWARE SCREW QTY.-2 PARTS NOT NEEDED SCREW QTY.-2 QTY.-2 WASHER QTY.-1 QTY.-1 WB1 WASHER QTY.-2 QTY.-2 WASHER QTY.-2 FIBRE WASHER 1.24 DIA LOCKNUT...
  • Page 8 Shower Tower Hardware Identification Chart The diagrams for these fasteners are shown actual size for fast identification. PLUMBING HARDWARE WASHER QTY.-2 STANDOFF QTY.-3 P3 WASHER QTY.-3 SCREW QTY.-6 WASHER QTY.-6 MIXER HARDWARE GASKET QTY.-1 FIBER WASHER .75 O.D. EXTERNAL TOOTH LOCK WASHER M4 PHILLIPS HEAD SCREW M4X12...
  • Page 9: Tower Assembly

    TOWER ASSEMBLY 1. Assemble the four (4) bails to the tower wall. Do not overtighten the nuts on the threaded shaft end. Overtightening may break the stud. WASHER (8) BOLT (8) H1 NUT (8) H2 SET SCREW (8) SHELF ILLUSTRATION 1 H1 BOLT QTY.-8 H2 NUT...
  • Page 10 2. Attach the water inlet and fill spout to the tower wall. (See Illustration 2 and 2a.) WATER INLET TOWER WASHER WALL CAULK ILLUSTRATION 2 FILL SPOUT WASHER TOWER WALL NIPPLE COMPRESSION CAULK RING ILLUSTRATION 2a WASHER QTY.-1 WASHER QTY.-1 WATER INLET QTY.-1...
  • Page 11 3. Attach the wallbar assembly to the tower wall. (See Illustration 3.) WALL BAR 1/8" BEAD OF CAULK WALLBAR STAND-OFF SHOWER WALL FLAT WASHER WALLBAR SHOWER HEAD BRACKET ILLUSTRATION 3 WASHER QTY.-2 EXTERNAL TOOTH WASHER QTY.-2 SCREW WASHER QTY.-2 SCREW QTY.-2 SIDE VIEW OF WALLBAR...
  • Page 12: Water Lines To Mixer/Diverter Valve

    WATER LINES TO MIXER/DIVERTER VALVE M/F 90 ELBOW (LOCATED IN PLUMBING KIT QUANTITY 4) HOT WATER LINE (74") COUPLING P2 STANDOFF QTY.-3 SCREW QTY.-3 M4X12 ILLUSTRATION 4 ATTACHING DIVERTER VALVE TO SHOWER WALL WASHER P3 SCREWS ILLUSTRATION 5 M/F 90 ELBOW WASHER P1 WATER SUPPLY TO SHOWER (12")
  • Page 13 TOWER WALL WASHER P1 12" HOSE 12" HOSE WASHER ILLUSTRATION 6 TOWER PINS 8-32 SCREW WASHER ILLUSTRATION 7 ILLUSTRATION 8 6. Attach the shower line to the water inlet and the fill spout line to the fill spout. (See Illustration 6.) WATER INLET P1 WASHER...
  • Page 14: Tower Installation

    TOWER INSTALLATION BACKWALL EQUAL DISTANCE AROUND DIAMETER OF BATHTUB ILLUSTRATION 9 (LEFT HAND SHOWN) 1. Locate the drilling template. Place it over the bathtub. The inner orange circle must be centered over the circular opening of the bathtub. (See Illustration 9.) Be sure the orange circle is spaced an equal distance around the bath cavity.
  • Page 15: Tower Disassembly

    DISASSEMBLY INSTRUCTIONS Although the J-Shower Tower is shipped partially assembled, it will have to be partially disassembled to install. After removing packing materials, follow the instructions below. 1. Remove end cap on the lower track. (Page 20, illustration 24.) 2. Remove the top ring. (Page 17, illustration 19.) 3.
  • Page 16: Placing Tower

    PLACING TOWER ILLUSTRATION 11 5. Dry fit tower pins into holes to check hole location. Apply sealant around the three tower wall holes on the bath and around the perimeter where the tower will set. (See Illustration 11.) 6. Place the tower pins in the holes and push the tower down firmly. The tower will stand temporarily on its own. Clean off excess sealant.
  • Page 17: Fixed Panel Assembly

    FIXED PANEL TO BOTTOM RAIL FIXED PANEL SCREWS LAY A 1/4" BEAD OF SEALANT UNDER THE BOTTOM RAIL FIXED PANEL ILLUSTRATION 12 DRILLING FIXED PANEL IMPORTANT: MUST DRILL AT 15 ANGLE TO AVOID DRILLING THROUGH DOOR GUIDE AREA. DOOR GUIDE AREA ILLUSTRATION 14 LOCATED IN HARDWARE KIT...
  • Page 18 FIXED PANEL ASSEMBLE TO BATH ILLUSTRATION 15 LOCATED IN HARDWARE KIT WASHER QTY.-5 QTY.-1 8. Screw 1-1/2" Allen set screw 3/4" deep into the bottom of the fixed panel. Lay a 1/4" bead of sealant under the bottom rail and inside the vertical frame. Place the assembly against the vertical edge of the tower and onto the bath surface.
  • Page 19: Mounting Top Ring And Wall Bracket To Tower

    RING TOP PLANE MARK BACK WALL MARK LINE TOP PLANE OF RING B O T T O M BRACKET TO BE IN LINE WITH TOP PLANE OF RING TOP RING TOWER WALL ILLUSTRATION 17 BRACKET TO WALL MARK LINE WALL BRACKET BOTTOM SURFACE SCREWS(2)
  • Page 20 DRILLING TOP RING IMPORTANT: MUST DRILL AT A 15 ANGLE TO AVOID 1/8" DRILLING THROUGH ROLLER TRACK OF TOP RING. ILLUSTRATION 20 DRILLING TOP RING ROLLER TRACK RING GROOVE IMPORTANT: MUST DRILL AT 15 ANGLE TO AVOID DRILLING THROUGH ROLLER TRACK. ILLUSTRATION 21 RING TO BRACKET WASHER (2)
  • Page 21: Fixed Glass Frame Attachment

    FIXED GLASS FRAME ATTACHMENT EXTRUSION SEALANT FIXED GLASS ILLUSTRATION 23 13. Apply sealant in frame and extrusion. Align and place extrusion above end cap onto the fixed glass.
  • Page 22: Sealing And Trimming

    L-EXTRUSION WALL CAULK ILLUSTRATION 24 LOCATED IN HARDWARE PACK SCREW QTY.-7 14. Install on the sides of the tower the aluminum extrusions provided. They may be sealed in place or secured with screws. Seal the end cap and place into the end of the lower track. Secure with self taping screw. (See Illustration 24.) SCREW H9 END CAP...
  • Page 23: Attaching Face Plate

    15. Assemble the face plate as shown in Illustration 25. Assemble the handle as shown in Illustration 26 (See handle instructions in handle kit). ATTACHING FACE PLATE APPLY SEALANT ALL AROUND INSIDE EDGE TOWER WALL LARGE FOAM GASKET SMALL FOAM GASKET ILLUSTRATION 25 LOCATED IN HARDWARE KIT GASKET...
  • Page 24: Handle Operation

    2I. Attach the shower hose. (See Illustration 27.) Use the washer supplied with the shower hose. SHOWER HOSE WALL BAR WATER CONNECTOR TEFLON TAPE WASHER FLEX HOSE ILLUSTRATION 27 22. For hot and cold operation of the handle, see Illustration 28. HANDLE OPERATION HAND HELD SHOWER...
  • Page 28 Jacuzzi Whirlpool Bath has obtained applicable code (standards) listings generally available on a national basis for products of this type. It is the responsibility of the installer/owner to determine specific local code compliance prior to installation of this product. Jacuzzi Whirlpool Bath makes no representation or warranty regarding, and will not be responsible for any code compliance.

This manual is also suitable for:

J-shower tower enclosure-sienaJ-shower tower merano

Table of Contents